K 10 svn:author V 4 jeff K 8 svn:date V 27 2004-04-04T19:12:56.000000Z K 7 svn:log V 239 - Use the proper constant in sched_interact_update(). Previously, SCHED_INTERACT_MAX was used where SCHED_SLP_RUN_MAX was needed. This was causing the interactivity scaler to lose history at a more dramatic rate than intended. END